HORSE digitalizes global machine safety management with a Power App

Client logo

HORSE is a multinational company in the automotive sector with factories in Spain, Portugal, Romania, Turkey and Latin America. With a global presence and highly complex industrial operations, the company is firmly committed to safety and regulatory compliance in all its workplaces. As part of its digital transformation process, HORSE identified a critical process that was still tied to manual tools: the management of CCS (Commissioning and Compliance Sheets; documents that record all the validations carried out before a machine goes into operation on a production line and that have legal validity) as a critical element that required a digital leap. To tackle it, HORSE trusted Itequia.

HORSE digitalizes global machine safety management with a Power App

01. The Challenge

Until then, CCS were managed manually using Excel spreadsheets and SharePoint folders. On a global scale, with thousands of validations per year, this method generated inconsistencies, loss of traceability and exposed the company to legal risks in the event of an accident. The need was clear: to have a centralized, reliable system compliant with industrial safety regulations, capable of working in all the group's plants regardless of country or language.

The project posed two major challenges:

  1. Centralizing and standardizing the validation process. Each plant managed its CCS independently, with no global visibility or guarantees of consistency. With up to 20 or 30 procedures open in parallel per factory, it was impossible to detect which CCS were delayed, which were accumulating workload or how many had been awaiting signature for weeks. Beyond operational inefficiency, the problem had a legal dimension: CCS are documents with evidentiary value. In the event of an accident, the company must be able to prove that the validation process was completed correctly and signed by the head of department. With scattered files and no digital signature, that traceability could not be guaranteed.
  2. Supporting a complex, high-volume process. With closing cycles of between 6 and 18 months, seasonal peaks of activity, around 650 users among technicians and subcontractors, 250 control points per procedure and up to 8 different validation roles involved in each CCS. The system had to be robust, flexible and scalable.

02. The Solution

Based on the analysis of the process and requirements of HORSE, Itequia designed and developed a custom Power App, integrated into the Microsoft 365 ecosystem and deployed progressively. Starting from
an initial pilot, until reaching all the group's plants.

An application designed for a global, critical process

​The solution centralizes the complete lifecycle of each CCS: from its creation to final closure, including the validation of 250 control points organized into 6 milestones (stages of the installation or maintenance process of a production line element), incident management and the legally valid signature flow.

Among the key features are:

  • Interface designed for the industrial environment. The design was adapted to real use on the plant floor, where operators usually work wearing gloves and protective equipment. Simple navigation and comfortable handling in those conditions were prioritized, reducing friction and the margin for error.
  • Home dashboard with a global view of all CCS (active, in progress and closed) with filters by plant, project, status and owner. For the first time, managers can simultaneously see the status of all open procedures in all plants.
  • Creation form integrated with HORSE's machinery purchasing app. When equipment comes from a Shopping List, its data is automatically transferred to the new CCS, eliminating manual work and transcription errors. Information flows from purchasing management directly to the validation process.
  • Milestone management with specific checklists per phase and a lifecycle structured in 5 statuses. From Pre-Signature to closure.
  • Evidence recording with photos and attached documents at each control point. If an incident is detected during a review, it is documented and linked to the CCS, providing the traceability needed in the event of an audit or legal proceeding.
  • Non-conformity management (LUP) with three criticality levels (high, medium and low). High-criticality incidents are blocking: until they are resolved and validated by all responsible roles, signing is disabled. Medium- and low-criticality ones are managed with full follow-up and traceability.

A progressive deployment to minimize operational impact

The project was structured in two phases: an MVP deployed at the Seville plant to validate the solution with real users and, subsequently, the roll-out to the rest of the group's plants with the full functionality. This approach made it possible to iterate quickly and adapt to the activity peaks of each factory.

Technology

Power AppsPower AutomateSharePoint OnlinePower BIMicrosoft 365

03. Highlights

This project has generated several key benefits for HORSE:

Guaranteed legal traceability

Each CCS is closed with recorded digital signatures, a complete validation history and a PDF export ready for audits or legal proceedings.

Real-time global visibility

Managers have, for the first time, a consolidated view of all procedures in all plants, with automatic alerts on delays and bottlenecks.

Collaborative work at scale

Up to 650 users work simultaneously on the same CCS without version conflicts, with roles and permissions that ensure each person sees and does exactly what applies to them.

Full integration into HORSE's digital ecosystem

The solution connects machinery purchasing management, the validation process and reporting in Power BI in a single flow, with no additional licensing on top of Microsoft 365.